How to operate and maintain the hot runner system?

Date:2023-03-24View:9259

Production, operation and maintenance of hot runner system:


(1) Preparation

The mould worker connects the cooling water channels of the moving mould, the fixed mould and the hot half mould. If the temperature requirements on both sides of the dynamic mold and the fixed mold are different, a separate water path must be connected for rotation. If the product appearance quality requirements are high, it is recommended to separate the mold temperature on both sides of the moving and fixed mold: if the heat generated by the heating of the hot runner on the side of the hot half mold is more, the cooling water can be separately connected; if the heat generated by the heating of the hot runner on the side of the hot half mold is absorbed or lost by the template, the model can be connected with the warm water at the appropriate temperature to compensate for the heat loss.


The heating cable between the hot runner and the thermostat shall be connected correctly according to the mark of the plug, and the plug QQ shall be locked to prevent loosening. If the heating output cable is connected reversely with the heating cable, all thermocouples will be burnt. After the mold is packed, the screw temperature of the first injection molding machine reaches the required set temperature. At the same time, turn on the mold temperature machine for heating, so that the mold temperature reaches the set temperature required for production. Then change the working temperature of the heated hot runner system to plastic.


It should be noted that after the hot runner of the new mold rises to the set temperature, it will take about 5 to 10 minutes (to ensure uniform heating). If the raw material contains fiberglass, it will take longer (about 10 to 15 minutes) because the heat transfer performance of the tungsten steel tip is poor.


(2) Power on

First of all, find out the raw materials used in the last mold test, adjust the temperature of the screw and nozzle of the injection molding machine to the temperature of the raw materials in the melting state, and select the appropriate plastic materials to clean the screw


If the plastic produced contains LCP + 30% glass fiber, clean the hot runner with pure LCP material (without glass fiber). After opening, it should be noted that the rubber outlet is very smooth; when it is found that one or several hot nozzles do not produce materials, there are two situations as follows:


There is cold material in the gate, which can be baked and melted by hot air gun, and then the safety door is closed to spray glue again;

If there is still hot nozzle without material, find out the number of nozzle according to the location map of hot nozzle. The temperature of the nozzle is increased by 10 ~ 20 ℃ on the original basis, and then it is ignited immediately (no more than 3 times). After tapping the glue, cool it to production temperature. At this time, if the gate is still blocked, the production shall be stopped immediately, and the hot nozzle of the blocked rubber shall be removed from the lower mold or the supplier shall be informed to handle it.


3) Stop waiting

Immediately clean the rubber in the hot runner with pure LCP material to keep the residual material in the hot runner and the head of the hot nozzle inside. It is a LCP material with good fluidity in the whole process, and ensure the next test or production to be carried out smoothly. For more than 5 minutes due to machine failure or other reasons, it is necessary to put the hot runner in the insulation state of 250 ℃; if more than 10 minutes, it is set to 120 ℃.


(4) Change the color of raw materials

Clean the barrel and screw with raw materials until the old color is completely clear. Check the machine's nozzles and hot runner gates for old colors. Open the mold core and remove the plastic in front of the nozzle.


(5) Stop machine repair mold

Before separating the hot runner from the core, make sure that the hot runner heating output is closed and the nozzle temperature is cooled to room temperature (< 60 ℃). If the raw material contains glass fiber, use the raw material without glass fiber to remove the raw glass fiber material, otherwise the glass fiber material may be carbonized in the next heating.

主站蜘蛛池模板: 久久手机免费视频| 成人精品| 欧美操大逼视频| 国偷自产一区二区免费视频| 爱啪啪影视| 亚洲日日操| 五月四房播| 日韩在线不卡视频| 欧美高清视频性播放| 久久久久久夜精品精品免费啦| 国产精品免费观看视频播放| 99热这| 五月情网| 五月天桃花网| 色综合色综合久久综合频道| 欧美午夜在线| 欧美高清a| 美国复古性xxxx| 久久九九99| 久久99国产精品二区不卡| 国产在线视频网址| 国产区久久| 国产成人综合亚洲欧美天堂| www.sewuyue| 99视频这里有精品| 91伊人久久| 亚洲国产精久久久久久久春色| 国产精品一级毛片不收费| 偷拍福利视频| 婷婷丁香六月天| 四虎成人在线| 手机香蕉网| 天堂色网| 我的夫人2015中字幕| 视频一区二区不卡| 四虎影院在线免费观看| 三区在线视频| 骚视频网站| 天天干天天看| 五月婷婷综合基地| a级毛片在线免费观看|